Saturday, May 12, 2007

Heating work

The trucks from Betlem's heating and cooling company arrive on site. The first job of the day is to install the copper pipes from the existing boiler to the radiant heating tubes. They will also run the refrigerant lines to the new air conditioner for the studio.



The Betlem men plan their sequence of work and formulate the plan of attack. They will place the new air conditioning unit in the pink insulation space above the ladder.





The connection with the existing boiler pipes and the new radiant heating selection valve and pump takes place, as the Betlem crew poses and smiles for the camera. Maybe they are used to being photographed!





The radiant head connections are tied in at the studio. The panel will be in the wall cavity of the new hallway between the house and the new room.