Site Preparation - April 10



To allow the heavy equipment to have access to the site, the first step was to build a new driveway.




The topsoil was peeled back and loads of gravel were put in place. When the project is completed, the gravel is to be picked up and the lawn is to be replaced.



We had already transplanted several of the tulip and daffodil bulbs, but the hill was scraped so we could collect any remaining plants and bulbs we wanted to try to save.












The hill is ready to be removed.